Project Scheduling Services for the Decommissioning & Demolition of Zion Nuclear Power Station ABOUT JINGOLI’s Project Controls personnel performed schedule management & development services during the decommissioning of the two-unit Zion Nuclear Power Station...
Portfolio
Three Mile Island Nuclear Generating Station Steam Generator Storage Facility
Construction of a 1,500 CY Cast-in-Place Concrete Structure ABOUT The Original Steam Generator Storage Facility was built as part of the Three Mile Island Unit 1 Steam Generator Replacement Project. The OSGSF provides long term storage of the two original steam...
Three Mile Island Nuclear Generating Station, Unit-2
Decommissioning Preparation, Planning, and Transition of TMI-2 ABOUT JINGOLI for the past two years has been intimately involved in the Demolition and Decommissioning preparation, planning and transition efforts to support an eventually successful license termination...
PSE&G Salem & Hope Creek ISFSI Construction of a Independent Spent Fuel Storage Facility
ABOUT This project consisted of the construction of a new nuclear spent fuel storage facility, support facilities, and expansion of the Protected Area for Salem Units 1&2 and Hope Creek Unit 1 in Hancock’s Bridge, New Jersey. Installation of approximately 1,400...
PSE&G Salem & Hope Creek Target Range
Construction of Firearm Training Ranges ABOUT The project consisted of the construction of a rifle and pistol range for NRC required training of nuclear power plant security personnel. Subsurface conditions required extensive geotechnical reinforcement. The berms are...
PSE&G Salem & Hope Creek Security Upgrades
Fast Tracked Security Upgrades ABOUT The project consisted of fast-tracked security upgrades required by the NRC at the Salem/Hope Creek Nuclear Plants in Hancock’s Bridge, NJ, including: Installation of a 1.6 mile concrete vehicle barrier, 3.5’ high by 10’ wide. Over...
PSE&G Salem & Hope Creek Demineralized Water Building
Design, Build, and Construct a new Demineralized Water Equipment Building ABOUT Joseph Jingoli & Son, Inc. was hired to design, build and construct an equipment building for the demineralization water production area of PSEG’s nuclear facility in Hancocks Bridge...
PSE&G Salem & Hope Creek Building Renovations
Multiple Building Renovations ABOUT The project consisted of a total of over 70,000 square feet of interior building renovations within 3 buildings including kitchens, dining areas, conference rooms, senior management offices, engineering / design offices, and general...
Oyster Creek Nuclear Generating Station: Security Access Building / Vehicle Checkpoint
Fast-Tracked Security Upgrades for the Oyster Creek Nuclear Generating Station ABOUT The Design Basis Threat (DBT) Security Upgrade project consisted of the fast-tracked security enhancements required by the Nuclear Regulatory Commission (NRC) at the Oyster Creek...
Oyster Creek Nuclear Generating Station: Demin Tank Foundation
Constructing Concrete Foundation of an 175,000 Isolation Condenser Demineralized Tank ABOUT JINGOLI was responsible for constructing the concrete foundation of a 175,000 gallon Isolation Condenser Demineralized Water Tank. JINGOLI performed all soil remediation in...
Nuclear Generating System Upgrades: Limerick, Peach Bottom, Oyster Creek
Services to Upgrade Security Measures for Three Nuclear Generating Stations on the East Coast ABOUT Joseph Jingoli & Son, Inc. provided Exelon Corporation Construction services to upgrade security measures for the following Nuclear Generating Stations: Limerick...
Construction of a New Nuclear Spent Fuel Storage Facility at Limerick Generating Station
Construction of a New Nuclear Spent Fuel Storage Facility at Limerick Generating Station ABOUT The project consisted of the construction of Limerick's Independent Spent Fuel Storage Installation (ISFSI), Heavy Haul Transport Facility Building (HHTF), Maintenance...
Indian Point Nuclear: Turbine Shell Demo
Plasma Cutting Four High Pressure and Immediate Pressure Steam Turbine Inner Shell Sections ABOUT This project consisted of plasma cutting four high pressure and intermediate pressure steam turbine inner shell sections weighing approximately 125,000 pounds into...
Fort Calhoun Nuclear Generating Station
Decommissioning & Demolition Planning and Estimating Line ABOUT JINGOLI’s Project Controls personnel developed the schedule for the decommissioning and demolition of the Fort Calhoun Nuclear Generating Station in Blair, Nebraska. Our personnel also conducted...
ESW/SW Underground Piping Relocations
Relocating Two 14” Emergency Service Water (ESW) Lines and One 20” Service (SW) Line ABOUT The project consisted of relocating two 14” Emergency Service Water (ESW) lines and one 20” Service Water (SW) line at the Oyster Creek Nuclear Generating Station in Forked...
Exelon Oyster Creek / Eddystone: Heavy Haul Path Transformer Replacement
Building Heavy Haul Path to Support Fast Track Change Out of Main Power Transformer ABOUT This project consisted of building an emergency heavy haul path to support the fast track change out of the main power transformer at Oyster Creek using a replacement transformer...
Bruce A Restart Reactor Vault Modifications
Reversal of Temporary Modifications on the East and West Reactor Faces ABOUT Our personnel planned and managed projects for Bruce Power in the reactor vaults of Units 1 & 2 during the Bruce A Restart. These projects were on the Critical Path immediately after...
Bruce A Unit 3 & 4 Turbine Refurbishment
Upgrade of Two Turbine Sets During Planned Outages ABOUT JINGOLI performed baseline planning, estimating, and scheduling for the Unit 3 & 4 Turbine Outage Projects and managed execution in Unit 4. These projects consisted of planned outages in Bruce A Units 3...